PERFORMANCE ASSESSMENT OF HYDROPOWER GENERATING PLANTS

dc.contributor.authorJ. Y. Jiya
dc.contributor.authorA. Nasir
dc.contributor.authorH. U. Ogboo
dc.contributor.authorA. Salihu
dc.date.accessioned2025-03-27T16:09:41Z
dc.date.issued2015
dc.description.abstractThis paper studies the performance of ahydropower scheme in Nigeria which contributes to an acute electricity supplyand has effects on the country’s development. This does not only restrict the socioeconomic activities to basic human needs, but also adversely affecting the quality of life too.The expected full load installed capacity for the hydropower scheme is 522.74MW but the generated capacity for the period under review is 305.147MW. Only about 40% of the installed capacity was available. Average Capacity factor for this hydropower scheme is 47%, min. of 25% in 2014 and max. of 83% in 2013 as against the industrial best practice of 50 – 80%.Total generation reduction due to downtime of the hydropower scheme is 28165773MWh amounting to 53% of the total installed capacity. Based on Power generation reduction of 53% the loss of revenue in naira was about 186 Billion naira.To improve the annual power generation, a complete overhauling of all the generators and adequate water management practice must be in place so that the available water can sustain generation throughout the year.
dc.identifier.isbn978-978-52341-6-9
dc.identifier.urihttp://repository.futminna.edu.ng:4000/handle/123456789/528
dc.publisherInternational Engineering Conference (IEC)
dc.subjectDowntime
dc.subjectRunning hour
dc.subjectReduction
dc.subjectCapacity
dc.titlePERFORMANCE ASSESSMENT OF HYDROPOWER GENERATING PLANTS
dc.typeArticle

Files

Original bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
FULL_COMBINED_PAPERS_9.pdf
Size:
21.43 MB
Format:
Adobe Portable Document Format

License bundle

Now showing 1 - 1 of 1
No Thumbnail Available
Name:
license.txt
Size:
1.71 KB
Format:
Item-specific license agreed to upon submission
Description: