Analysis And Prediction Of Cost And Time Overrun Of Millennium Development Goals (MDGS) Construction Projects In Nigeria.
No Thumbnail Available
Date
2012
Journal Title
Journal ISSN
Volume Title
Publisher
Developing Country Studies
Abstract
Abstract
The paper focuses on the analysis and forecast of cost and time overrun of MDGs construction projects in Nigeria.
Twenty five MDGs construction projects from (2006-2009) were critically investigated and time and cost overrun
of the project were studied. The Statistical Package for Social Scientists (SPSS) 19.0 version was used to analyse
the variables using Paired t-test and simple regression at 95% confidence limits. The analysis was based on the
adaptation of requisition method. The validity test on the efficiency of the model was highlighted using the
confidence interval to enhance the application of the models. Mathematical models were developed. The findings
shows that there is a significant different between the total contract sum, cost overrun, total contract duration, and
time overrun for the MDGS projects. The study suggests acute need for government to engage in proactive
strategic planning and approaches to keep construction project cost and time within reasonable limit for the
actualization of MDGs policy of development and environmental sustainability.
Description
Keywords
Analysis and Prediction, Cost Overrun, Time Overrun, Millennium Development Goals and Construction Projects.
Citation
Ijigah, E. A., Ogunbode, E. B. & Moshood, O. I. (2012). Analysis and Prediction of Cost and Time Overrun of Millennium Development Goals (MDGS) Construction Projects in Nigeria. Developing Country Studies, 2(10), 140-147.